Q-2, r. 32.2 - Regulation respecting the temporary implementation of the amendments made by chapter 7 of the Statutes of 2021 in connection with the management of flood risks

Full text
7. Every person who carries out one of the following activities on the shore or bank of a lake or watercourse must obtain prior authorization from the local municipality in whose territory the activity is to be carried out:
(1)  the construction of a road, on the conditions set out in section 325 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact (chapter Q-2, r. 17.1);
(2)  the construction of a culvert with a total opening equal to or greater than 1.2 m and no more than 4.5 m, on the conditions set out in section 327 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(3)  the construction of a stabilization work on an embankment, on the conditions set out in section 337 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(4)  work to establish, modify or extend a pipe in a waterworks system, sewer system or storm water management system, or a ditch or outflow, on the conditions set out in section 338 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(5)  the laying out of a water crossing for fording with a width of not more than 7 m where the crossing point is connected to a road or trail other than a trail used for a forest development activity;
(6)  the construction of a structure of not more than 5 m in width to cross a watercourse, with no support or stabilization in the littoral zone;
(7)  the construction of a main residential building, as well as that of its buildings, accessory works and the necessary access, on the conditions set out in section 340.2 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(8)  (paragraph replaced);
(9)  (paragraph replaced).
O.C. 1596-2021, s. 7; O.C. 984-2023, s. 2.
7. Every person who carries out one of the following activities on the shore or bank of a lake or watercourse must obtain prior authorization from the local municipality in whose territory the activity is to be carried out:
(1)  the construction of a road, on the conditions set out in section 325 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact (chapter Q-2, r. 17.1);
(2)  the construction of a culvert with a total opening equal to or greater than 1.2 m and no more than 4.5 m, on the conditions set out in section 327 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(3)  the construction of a stabilization work on an embankment, on the conditions set out in section 337 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(4)  work to establish, modify or extend a pipe in a waterworks system, sewer system or storm water management system, or a ditch or outflow, on the conditions set out in section 338 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(5)  the laying out of a water crossing for fording with a width of not more than 7 m where the crossing point is connected to a road or trail other than a trail used for a forest development activity;
(6)  the construction of a structure of not more than 5 m in width to cross a watercourse, with no support or stabilization in the littoral zone;
(7)  the reconstruction of a main residential building that has sustained damage, with the exception of damage connected with flooding or submersion, on the conditions set out in subparagraph 1 of the first paragraph and the second paragraph of section 340.2 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(8)  the enlargement of a main residential building on the conditions set out in subparagraph 2 of the first paragraph and the second paragraph of section 340.2 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(9)  the construction of accessory buildings and works for a main residential building, including the necessary access, on the conditions set out in subparagraph 3 of the first paragraph and the second paragraph of section 340.2 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact.
O.C. 1596-2021, s. 7.
In force: 2022-03-01
7. Every person who carries out one of the following activities on the shore or bank of a lake or watercourse must obtain prior authorization from the local municipality in whose territory the activity is to be carried out:
(1)  the construction of a road, on the conditions set out in section 325 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact (chapter Q-2, r. 17.1);
(2)  the construction of a culvert with a total opening equal to or greater than 1.2 m and no more than 4.5 m, on the conditions set out in section 327 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(3)  the construction of a stabilization work on an embankment, on the conditions set out in section 337 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(4)  work to establish, modify or extend a pipe in a waterworks system, sewer system or storm water management system, or a ditch or outflow, on the conditions set out in section 338 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(5)  the laying out of a water crossing for fording with a width of not more than 7 m where the crossing point is connected to a road or trail other than a trail used for a forest development activity;
(6)  the construction of a structure of not more than 5 m in width to cross a watercourse, with no support or stabilization in the littoral zone;
(7)  the reconstruction of a main residential building that has sustained damage, with the exception of damage connected with flooding or submersion, on the conditions set out in subparagraph 1 of the first paragraph and the second paragraph of section 340.2 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(8)  the enlargement of a main residential building on the conditions set out in subparagraph 2 of the first paragraph and the second paragraph of section 340.2 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact;
(9)  the construction of accessory buildings and works for a main residential building, including the necessary access, on the conditions set out in subparagraph 3 of the first paragraph and the second paragraph of section 340.2 of the Regulation respecting the regulatory scheme applying to activities on the basis of their environmental impact.
O.C. 1596-2021, s. 7.